Fabrication / installation / tie-ins

Piping that makes the equipment a system.

We fabricate and install process and inter-equipment piping for cooling plants, with practical routing, efficient field assembly, reliable testing, and serviceable connections.

Completed hydronic distribution headers in a mechanical plant
Process pipingCCCS / PIP-02

Connected execution

Fabrication decisions made with installation in mind.

In chilled-water, condenser-water, and cooling-tower systems, many requirements share the same space: access, elevations, valves, supports, weld sequence, testing, insulation, and commissioning.

We plan spools, equipment connections, supports, valves, and tie-ins around equipment setting, field access, pressure testing, flushing, and startup.

TIG welding a stainless-steel process-piping joint
Process piping installation in the field

Piping-side capabilities

Field-ready piping packages.

06 coordinated capabilities
01

Constructability review

Routing, access, tie-in, support, weld-position, and installation-sequence review before fabrication.

02

Shop fabrication

Controlled spool fabrication, fit-up, welding, labeling, and shipment planning for efficient field assembly.

03

Field installation

Equipment connections, mains, branches, valves, specialties, supports, and final tie-ins.

04

Hydronic systems

Chilled water, condenser water, glycol, heat-recovery, and related process-cooling loops.

05

Quality control

Material control, weld tracking, inspection coordination, pressure testing, flushing support, and turnover records.

06

Cutovers

Phased tie-ins, outage planning, prefabricated connection points, and active-facility coordination.

Execution priorities

Fabricated and delivered in the right sequence.

01

Spool and joint identification

02

Equipment nozzle coordination

03

Valve and specialty accessibility

04

Pipe support integration

05

Testing and flushing sequence

06

Insulation and service clearance

Bring us in early

Resolve piping connections before they become field conflicts.

Send us the drawings, equipment connection details, routing limits, test requirements, and schedule. We will review the package for fabrication, installation, access, and turnover.

Start the conversation →